Installation
Revolution in the lift industry began in 1996 when the most practical and most spread concept of the “gearless lift” was introduced to the world.
By the beginning of the year 2003, more than 70 000 machine-room-less lifts
was ordered and more than 58 000 units were installed.
This huge experience and its global success put the “gearless lift” ahead of
all the competition. 
- Lift speed: 1.0 m/sec – up to 60 m; 1.78 m/sec – up to 106 m
- Maximum lifting height: for a speed of 1.0 m/sec it is up to 70.10 m i.e. 36 floors
- Maximum system of combining: up to 6 lifts in a group
Machine room-less lifts are very economical, ideal for transportation of people and cargo in mid-high and very high buildings. These are high speed; high capacity lifts with wide selection in design, detail and additional possibilities which improve its functioning.
These machine-room-less high capacity lifts are used for transportation in tall buildings up to 63 stories high.
Machine-room-less lifts require a small engineering room secured above the lift’s shaft. This room takes up only about 40% of space unlike rooms for traditional lifts.
This way you save up in building materials, there is an optimized space for an engineering room and the exterior of the building is not disrupted with big engine rooms.
With a machine-room-less lift you will get a:
- Fast installation
- More comfort
- Reduced noise level
- Great choice of design

